Browse Forums Building A New House Re: Electrical Plan MJH 10Oct 23, 2022 5:37 pm ![]() Hi there. Thanks for your reply. Just looking at the Essentials package,and see that it includes an 'additional power circuit'. Do you know what this means? Hi, I don't remember exactly but I think it was not necessary. Re: Electrical Plan MJH 11Oct 31, 2022 11:36 am As noted ,wiring the bottom story of a 2 story is a pain after completion. In our case , the builder would not allow any other services on site until after handover so we paid for their data guy to rough in extra cables that were left in the walls / ceiling for future use. Cost up front but way cheaper the labour cost of installing later Example , Extra cabling for security system and camera run back to the proposed hub ( linen CB ) location Hi all, We are currently just up to lockup stage. Well our portal says lockup complete but our electrical is being done this week, so in theory, fully completed lockup by… 0 13907 2 9493 If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 22690 ![]() |