Browse Forums Building A New House Re: KDR - NBN re-connection process 6Apr 19, 2022 4:25 pm dhaneri @Jason526 By NBN box if you mean the little Gray utility box they put on side of wall for HFC connections then that got destroyed with demolition. I do however have Aries modem and since site is still the same, not sure if they will need to issue me new one or not. But they definately need to install new utility box and the cable from that to inside of house in my comms room. We do however have P20 conduit ready for them to pull cable through from the position of utility box to comms room for them to install wall plate etc. I'm planning to put new connection application 2 months early just in case NBN takes their time in issuing appointment date etc. In my case, we have conduit ready from side of garage going underground to the pole that electrician installed at the corner of our property as with all new houses in existing suburbs. 3 Phase electricity connection is already connected to pole and underground through to meter box on side of garage. I'm not exactly sure what the NBN guy told my electrician to install during his first visit. I know that they had to dig a trench from front boundary to the house. I guess that was the cable within my property. My NBN box is a portable black box that looks like a router. It's currently plugged into the data point inside garage. This NBN box has a modem function already. All I needed to buy myself was a router to set up wifi. Thanks for info, yes met with Power Utility, Builder's Site Supervisor and Electrician on site and aligned on the mains connection. Seems like the builder and Electrician… 2 10001 Yes, i hace signed build contract and currently awaiting colour selection appointment. 2 29136 Hi all I'm currently building a duplex in Sydney and we need to do a new water connection to the second unit. The water main is on the other side of the road so we need… 0 3179 |