Browse Forums Building A New House Re: Building Platform and Slab Heights 2Jul 14, 2021 10:35 am ryujio with comments such as this is just preliminary and it will get sorted at a later date. You should have co-ordinated you own drawings better. Usually it gets sorted out later after you paid more money in finalising the contract drawings .. By that time you are knee deep in cost variation increases, unforeseen engineering, and left in a worse off position. Don't Pay Any More Money or sign anything ..you'll loose the lot if you pull out. Cheers Chris Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Building Standards; Getting It Right! We bought a house in 2015 advertised as a 7/2/2, 4br up, 3br down (7br), and to date, it’s a great house. However, we’ve just had it valued and it’s come in as a… 0 11986 Firstly the ableflex that has been installed needs (manufactures specification) a sealant cap over the top, preventing water draining down between the slab and the… 3 7776 Thanks for the insights, that makes perfect sense, and yeah, I will be leaning on the experience of the excavator operator entirely. 6 16123 |