Is that 5 months to start construction? With all the building activity, don't forget the planning permits can take a while too!
No, we were told 5 for the entire construction. Was told colour selection, contract and finance can be done by Oct.
Hi. We also talked to Metricon today. Do you mind sharing the quote which they have given you?
at the moment the estimate is around 600K.
Is that 5 months to start construction? With all the building activity, don't forget the planning permits can take a while too!
I have been following your posts to see your home is progressing. How much was the construction period promised to you? Did you go with refrigerated cooling?
Our base price in Oct 2019 was 477,700.
The base price quoted is $500,400 inclusive of the 10K promo package.
Our base price in Oct 2019 was 477,700.
The base price quoted is $500,400 inclusive of the 10K promo package.
Thank You, Can I message you?
Our base price in Oct 2019 was 477,700.
The base price quoted is $500,400 inclusive of the 10K promo package.
Thank You, Can I message you?
Sure, we are only just past slab stage, frame is not finished yet.
Our base price in Oct 2019 was 477,700.
The base price quoted is $500,400 inclusive of the 10K promo package.
Thank You, Can I message you?
Sure.
Is that 5 months to start construction? With all the building activity, don't forget the planning permits can take a while too!
I have been following your posts to see your home is progressing. How much was the construction period promised to you? Did you go with refrigerated cooling?
356 days building period, 260 days of actual building work.
We did change to reverse cycle refrigerated air con. They give a refund on the ducted gas heating. We are having 10 zones, and that was cheaper than adding air con to the ducted gas heating system.
Because of the size it requires three phase power also, something else to keep in mind if you don't want split systems everywhere, along with multiple compressors!
Is that 5 months to start construction? With all the building activity, don't forget the planning permits can take a while too!
I have been following your posts to see your home is progressing. How much was the construction period promised to you? Did you go with refrigerated cooling?
356 days building period, 260 days of actual building work.
We did change to reverse cycle refrigerated air con. They give a refund on the ducted gas heating. We are having 10 zones, and that was cheaper than adding air con to the ducted gas heating system.
Because of the size it requires three phase power also, something else to keep in mind if you don't want split systems everywhere, along with multiple compressors!
Are you going with reverse cycle with the builder or post handover ?
Is that 5 months to start construction? With all the building activity, don't forget the planning permits can take a while too!
I have been following your posts to see your home is progressing. How much was the construction period promised to you? Did you go with refrigerated cooling?
356 days building period, 260 days of actual building work.
We did change to reverse cycle refrigerated air con. They give a refund on the ducted gas heating. We are having 10 zones, and that was cheaper than adding air con to the ducted gas heating system.
Because of the size it requires three phase power also, something else to keep in mind if you don't want split systems everywhere, along with multiple compressors!
do you remember how much Metricon charged you?
Any reason why you guys didnt take up the 9K aircon offer from metricon?
Related
13/12/2023
0
Hi, First of all, thank you to this community for sharing your thoughts and opinions. We are in early days of our pre-contract stage for Metricon Doulton and we are…
29/01/2024
0
Hello All 🙂 We are planning to start our journey of construction our first home. We zeroed down on Metricon and henley homes based on design suitable for our lot and…
15/03/2024
0
We don’t live in VIC so want to know the exterior colours of Lumiere display so we can see it at the paint shop. Not building with Metricon so my request went…