The pool excavation was going great until we hit an old septic tank. Had to arrange for a separate skip to dispose of it. After that is was smooth sailing with the dig, steel fixing, and plumbing now complete. Concrete booked for this coming Tuesday, 2/4/24.
Wow! That is very exciting for you! May I ask, in preparation for the pool - when you were initially designing the house etc, what extra work did you need to do in relation to engineering, soil tests etc, knowing your pool was going to be positioned right next to the house? We want the same thing 🙂 (only in research phase currently).