Browse Forums Building A New House 1 Jan 26, 2021 11:12 pm Hi all I’m looking to get electricity connected to my greenfield rural site. Below is the scope of works I’ll be sending out to get quotes. Appreciate if anyone can let me know if I should ask for anything else and also how long it took for people to get connected from start to finish. Looking to have a large transformer for plenty of headroom capacity. Thanks “Can you please provide a quote for preparing designs and liaising with Essential Energy re plans and obtaining appropriate approvals from Essential Energy and council (if applicable); install a transformer on the existing pole on – we are looking for a transformer that can handle a large load / capacity for 3-phase for x2 houses and a workshed; install a telegraph pole just inside / outside my fence line; install a metre box outside my fence line and wiring to mains[, with a private pillar a few metres away]; underground cabling approx. 200-220m in length from the private pillar inside the fence line up to the dwelling site – TBC whether in conduit or direct burying and a price for each copper cable and also aluminum cable [240]mm; installing x4 power points in metre box / private pit for builders supply; and [install temporary earthing].” if it's the look that you're not happy with, the easiest option would probably be to spray paint it all into the same color as the walls so it blends in. there might not… 3 4511 3 51876 Hi all I'm currently building a duplex in Sydney and we need to do a new water connection to the second unit. The water main is on the other side of the road so we need… 0 4478 |