Browse Forums Building A New House Re: Found out raised bathroom at completion stage. 8Jan 14, 2021 6:57 pm I find that all Franchise Style Building companies like GJ Gardner, Hotondo etc always have good and many reviews on all these sites compared to any other stand alone Builders as they are just Marketing Companies at the end of the day, thats just my personal opinion. Re: Found out raised bathroom at completion stage. 9Jan 16, 2021 1:14 am ![]() I find that all Franchise Style Building companies like GJ Gardner, Hotondo etc always have good and many reviews on all these sites compared to any other stand alone Builders as they are just Marketing Companies at the end of the day, thats just my personal opinion. 😩 so you know if there’s stand of the height of the step? I realised the laundry floor step and the bathroom step, their heights are so different. One is around 1cm only. So Inconsistent. But same style of tiles in both rooms. Re: Found out raised bathroom at completion stage. 10Jan 16, 2021 1:58 am ![]() I find that all Franchise Style Building companies like GJ Gardner, Hotondo etc always have good and many reviews on all these sites compared to any other stand alone Builders as they are just Marketing Companies at the end of the day, thats just my personal opinion. Also if I want it fixed. How much do you think it’s going to cost? Re: Found out raised bathroom at completion stage. 11Jan 16, 2021 9:17 am A cheaper option to fix the steps into the wet areas is to ramp up the floors leading into them gradually if practical. The reason for the different heights is probably the room design and the gradient of falls, but most would use the same height angle as doorways regardless of design. Cost to fix the issue in the wet areas would be massive as you would need to redo the whole process of wet areas along with removal of existing and the modifications and inspections required to resolve the issue. To make all floor areas to be level throughout the house takes a lot of planning and needs to be done from the initial stages. Material choices need to be finalised prior to the final drafting plans for the build. Re: Found out raised bathroom at completion stage. 12Jan 16, 2021 1:21 pm ![]() A cheaper option to fix the steps into the wet areas is to ramp up the floors leading into them gradually if practical. The reason for the different heights is probably the room design and the gradient of falls, but most would use the same height angle as doorways regardless of design. Cost to fix the issue in the wet areas would be massive as you would need to redo the whole process of wet areas along with removal of existing and the modifications and inspections required to resolve the issue. To make all floor areas to be level throughout the house takes a lot of planning and needs to be done from the initial stages. Material choices need to be finalised prior to the final drafting plans for the build. I wish I knew that before the build. They did not let us choose the materials before the DA approval. They initiated all the flooring plan before internal designing choices. We are thinking to raise the whole floor up and change the doors, may be a cheaper method. I'd be asking the building why the slab doesn't cover the bricks and go to the edge fo the building footprint. There also appears to be some rubbish in the gap. To put a… 1 5428 Hi there, I’m having a pool built next to the side of the house. The pool height and pavers along side of the house are higher than the weep holes. The pool builder is… 0 684 To be fair to the soil testers, they have done what they were asked most likely. I looked at the borehole locations from a geotech. investigation point of view and the… 5 1696 |