Pricing up, appreciate any input please

Page 1 of 1
im missing frame and truss supply as well as hydraulics.

what else am i missing or have i gone too light or too heavy on??

























itemunitsratepricepriced from
Engineering (Slab/Frame)125002500inertia engineering
Soil Test1500500inertia engineering
SUBTOT3000
Concrete Slab
subgrade (3 x 8hour days)241543696guess
supply (350m x 0.22/m) @ $200/m3504415400budgy
plastic3107321bunnings
pods250164000internet
mesh (SL102)301454350aubry wire industries
straight bar (N12)13081040aubry wire industries
labour (6men 2 days @$500/m/d)125006000statewide
SUBTOT34807
Floor Finishes
Epoxy floor to garage (By Us)5810580bunnings kits
Polished concrete17211519780ozgrind range 90 to 120
Carpet101707070internet rate
External Tiling (By Us)5970413050 tile 10 glues, self labour
SUBTOT31560
FAƇADE
lay rendered block per spm2408821120nick harman
render brickwork240409600internet rate
external paint240102400internet rate
SUBTOT33120
Hydraulics
plumbing inground
Tanks (12,000L QTNK)216953390qtanks
Filter (UV 105L/m)130003000internet rate
Pump1900900internet rate
SUBTOT7290
Roof Sheeting4008032000internet rate
Fire report and works350186300stroud (18/m2)
SUBTOT38300
Internal Linings
Wall linings7012014020internet rate
Wall Painting Internal701107010internet rate
SUBTOT21030
joinery13000030000stab in the dark
sinks/taps/basins/baths/towel
SUBTOT30000
doors
roller shutter supply only140004000ebay
main front1859859bunnings Corinthian Doors 1200 x 2040 x 40mm Blonde Oak AWOWS 5VG Clear Glass Entrance Door
unit front1812812bunnings Corinthian Doors 1020 x 2040 x 40mm Blonde Oak AWOWS 5VG Clear Glass Entrance Door
single cavity2380760180 frame per leaf incl hardware
double cavity1760760bunnings
internal hollow101981980humes HAM1
internal solid5198990humes HAM1
internal door handles1540600Lockwood 63mm black velocity L3
hinges2310230pinnacle 100mm fixed butt black 2 packs
front door hardware2400800bunnings
SUBTOT11791
electrical
dbl gpo (supply)447.15314.6clipsal iconic d-gpo sparky direct
light switch (Supply)309.9297clipsal icopnic assumed double sparky direct
cable4126.55062.5mm 100m drum sparky direct
downlights (supply)80161280clipsal TPDL1C2 9w tri colour dimmable led downlight sparky direct
fans (supply)83652920DC fans beacon lighting
IXL (main & flat) supply2219438IXL Tastic Silhouette 3 In 1 Bathroom Heat Fan Light
main board termination0??
3 phase feed from boundary0??
fees/connections0??
solar (8kW)180008000our system was 1000/kw
external d-gpo524.14120.7sparky direct
SUBTOT13876.3
glazing hxw
2100x610 awning83722976onlinewindows.com.au
1200x610 awning2266.51533.02onlinewindows.com.au
1754x600 louvre2557.821115.64onlinewindows.com.au
600x1810 fixed4222.64890.56onlinewindows.com.au
1200x1510 slide2328.32656.64onlinewindows.com.au
2100x3610 slide door116101610onlinewindows.com.au
2100x1810 slide door47513004onlinewindows.com.au
SUBTOT10785.86
landscape12500025000guess
asphalt driveway12500025000Allroads
pool 15000050000budget
Land450000offer
Stamp Duty15000online calced
TOTAL BUILD800560.2
Hey DoinitSideways Welcome to the forum
Try restructuring the list into a spreadsheet. Use
Headings, Elements/Trades, Sub elements Trades/DIY
Elements can be divided into materials, Labour, plant, Overheads/profit or savings
Then use Quants, Units, Rates, Costs, etc,
Tip use 3D bim eg. Element brickwork -> Sub Element Window glazing upgrades
Advantages
1. Visually easy to read and understand
2. Data links directly to model
3. 3D Model is dynamic and Data can be queried and instantly changed
4. 3. is handy when negotiating pricing/rates, especially when someone's trying to take you for a ride
5. Bim/Python links the IoT and can be Automated..unlike your list which is static and prices outdates

BTW I have no idea what your are doing?...more info, sketch, details, etc
OT,
I suggest you start with a 3D designer use the correct software and ask the designer for access to the model & Links,
then post screen shots
Stage 1 Model/data -> Preliminary-> Planning and estimates, then
Stage 2 requires refining the model/Data -> Engineering & Building
Cheers
Chris
StructuralBIMGuy
Hey DoinitSideways Welcome to the forum
Try restructuring the list into a spreadsheet. Use
Headings, Elements/Trades, Sub elements Trades/DIY
Elements can be divided into materials, Labour, plant, Overheads/profit or savings
Then use Quants, Units, Rates, Costs, etc,
Tip use 3D bim eg. Element brickwork -> Sub Element Window glazing upgrades
Advantages
1. Visually easy to read and understand
2. Data links directly to model
3. 3D Model is dynamic and Data can be queried and instantly changed
4. 3. is handy when negotiating pricing/rates, especially when someone's trying to take you for a ride
5. Bim/Python links the IoT and can be Automated..unlike your list which is static and prices outdates

BTW I have no idea what your are doing?...more info, sketch, details, etc
OT,
I suggest you start with a 3D designer use the correct software and ask the designer for access to the model & Links,
then post screen shots
Stage 1 Model/data -> Preliminary-> Planning and estimates, then
Stage 2 requires refining the model/Data -> Engineering & Building
Cheers
Chris

Hi Chris,

I wanted to upload my spreadsheet, but appears i can only upload jpeg. So when i copied and paste it looses the font/bold etc i had to make it easier to read.

I should have clarified im more looking at rates to see what peoples take is and also any elements im missing that i need to include or account for.


Thanks for your input. Ive done a crude design using magic plan



Ive engaged an architect to take this rough design and refine it. I work in commercial construction, so i have access to decent rates and also have the advantage that im building with cash, so will be chasing a number of trades labour for cash prices.

What 3D model program is easiest to use? i got confused with adding the rates to magicplan...

Cheers,
Josh
DoinitSideways

I wanted to upload my spreadsheet, but appears i can only upload jpeg. So when i copied and paste it looses the font/bold etc i had to make it easier to read.

I should have clarified im more looking at rates to see what peoples take is and also any elements im missing that i need to include or account for.

Thanks for the sketch
If you want to share a spreadsheet use G sheets with link
Otherwise what you upload is an Static Image
Break the elements up as it would be built ground up here
2S Build to lock-up

DoinitSideways

Thanks for your input. Ive done a crude design using magic plan


The Floor plan needs to be translated into a more robust & complete Bim program that professionals use.
Otherwise, It's too much work/cost in redoing/fixing the 3D model

DoinitSideways
Ive engaged an architect to take this rough design and refine it. I work in commercial construction, so i have access to decent rates and also have the advantage that im building with cash, so will be chasing a number of trades labour for cash prices.

What 3D model program is easiest to use? i got confused with adding the rates to magicplan...

Cheers,
Josh

What software is your designer/Architect using?
BTW, I wouldn't be telling them straight off that i have cash for the build, save that up your sleeve for the final bargaining stage

3D bim on windows revit, On a mac/win Vws the later is half the price, easiest to use
Though Engineers prefer revit
Steer clear of Archicad users..it is not as advanced as revit, engineers don't use it and same price

Start breaking up the Bim Model and post back... LOL I award marks for initiative, presentation and accuracy

Cheers
Chris
Architect is a mate... I work in commercial construction as a structures foreman. Have worked with multiplex, Hutchinson builders and Westfield over the years... I have a lot of commercial contacts... but have never built a house. So know very little about pricing, and have no real contacts for anything to do with timber...
Housing is a walk in the park compared to Commercial builds, don't use the same rates
It's piecemeal work-> Unit work completed per day-> measured in time or units
OT, I'd go bankrupt if I paid $500/day labour without receiving the required output
Work on 2+1 =$900/day
Related
8/06/2023
0
Hello to all of you. Any advice please?

Building A New House

A question. Im in Queensland and building a new home. We managed to reach practical completion 6 weeks ago but we haven't heard any date for handover yet. Who should we…

20/09/2023
7
Does this concrete perimeter raise any concern? Help please!

Paving & Concreting

i had the my concreters concrete right up to the fence. I have pits all along my path, so the water tends to drain away from the house and into the pits. There's only one…

11/07/2023
0
Any issues?