Browse Forums Building A New House Re: 4m Side Sloping Block (Questions!) 8Jan 02, 2021 5:06 pm DanielAkula Any idea how much slope you had? At this point I'm gathering as much reference information as possible! I gather the difference between "P" and "M" soil types inflated slab costs significantly? The soil classification regarding foundation movement is explained here: https://www.vba.vic.gov.au/consumers/gu ... n-movement Quote: Soil classifications include: A – non‐reactive – sand and rock sites – little or no ground movement S – slightly reactive clay sites M, M–D – moderate reactive clay or silt – movement due to moisture changes H1, H1–D – highly reactive clay sites H2, H2–D – very highly reactive E, E–D – extremely reactive P – soft soil, vary depths of fill – reactive sites subject to abnormal moisture conditions or sites which cannot be classified otherwise. Our block according to Landsat had about 6m slope corner to corner, but probably around 4m slope within the building envelope before we did the original earthworks. At the time of levelling the site, we asked our landscaper to make the area as level as achievable within the size of the building +1m on each side by cutting into the hill at the back of the house as much as possible to minimize filling at the front, then batter the remaining slope to natural ground level at 45 degrees slope. This type of site earthworks was allowed by our Council without a permit. Give Jonathan a call. Tell him you know me. He is in my opinion the best surveyor I have ever worked with. His number is 0425 285 622 All the best Simeon 3 12527 i did click it, still couldnt make it out rofl. in any case, doesnt look like too extreme a slope, you may be in luck. Just shoot out some emails to volume builders in… 3 18644 Howdy all. I am looking for feedback on what people would do to maximise and make an area as flat as possible. First, out the front of the house is a sloping hill, pretty… 0 20283 |