Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
Anyone here familiar with piering?
We are at the pre slab phase, and the builders report that the piering has been completed. When i look at the site, i can only see piering around the perimeter, but the engineering plans indicate there are piering throughout the house.
We had to upgrade to a H1 slab with additional piering beyond the 45m included as their standard due to soil condition and moderate salinity.
Im wondering if they need to stick to the engineering plan and include pierings to the inside of the slab or can they just do the perimeter
Thanks in advance