Oh and forgot to say that the painter was there on Monday when I went for the tiling meeting so the ceiling and door frames have all been painted.
Noticed that the ensuite toilet door frame has been replaced and the old one is out the back all twisted so no idea what happened there. It will have to be repainted.
I have also noticed that one of the plug sockets is in a terrible position so need to email and see if I can get them to move it before the wall tile the kitchen. It's only since the cabinets have gone in that I noticed it. Anyone any experience of getting them to move a plug socket so late on?