I did half the brickwork on a PD single story house, got to the second lift and checked all the window heads so I could fit the lintels only to find that they all varied by as much as 25mm from window to window.
All the window heads were supposed to be the same height, its very hard to adjust brickwork 5mm never mind 25mm, some of the windows were within 1200mm of each other.
I rang the supervisor who came out and told me to "just" do it, I told the boys to pack up and I told the supervisor to get his carpenter back to fix the windows.
We left the job.
The supervisor told me to just do it again, I refused as I knew it would come back and bight me on the bum.
He told me to bugger off and dont go back his job, which I did.
Next day I went back with the camera only to find other brickies finishing it off, they told me they get to finish off lots of jobs for PD after the initial brickies refuse to do any * stuff.
Sad isnt it.
I even had to fight to get paid, I eventually got paid.
The job was in Jorjenson Doreen..
brittany
petal
reaver
King willy