![Laughing :lol:](./images/smilies/icon_lol.gif)
![Shocked :shock:](./images/smilies/icon_eek.gif)
I am currently at the slab stage. The site cut, piering and plumbing had been done, Next week the slab is scheduled to be laid. Pics are coming !
http://i230.photobucket.com/albums/ee290/draco_jr/IMG_4300_zpsaafc40c0.jpg
http://i230.photobucket.com/albums/ee290/draco_jr/IMG_4313_zps2ad2e991.jpg
The piering and plumbing had been done during the week and when I came to check the work, it was too dark to take pictures, I will do them during the week end and post it here after
![Dance :z:](./images/smilies/dance.gif)