![Very Happy :D](./images/smilies/icon_biggrin.gif)
One thing, did you get your tiles in the bathrooms made higher and if so, what was the rough cost of this? Have no idea how much this will all add up to at prestart!
Love your floor tiling too
![Smile :)](./images/smilies/icon_smile.gif)
Browse Forums Building A New House Re: Sezza's Perth Build.. waiting for keys :) 382Mar 19, 2011 11:58 am Built with Sw1tch H0mes >Build thread< House status 15/12: Gates and A/C finally installed! Sep 09 Bought block, Dec 09 Engaged builder, Jul '11 Moved in Re: Sezza's Perth Build.. waiting for keys :) 383Mar 19, 2011 12:30 pm contract 10/11 prestart 04/10 slab 06/10 bricks 07/10 roof 09/10 plaster 10/10 Ceiling 10/10 LOCKUP 10/10 tiling wet areas 11/10 garage floor 11/10 PCI 12.01.11 handover 11.02.11 https://forum.homeone.com.au/viewtopic.php?f=31&t=39361&hilit=malvern+springs We are in !!! ![]() ![]() ![]() ![]() Re: Sezza's Perth Build.. waiting for keys :) 384Mar 19, 2011 8:21 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Perth Build.. waiting for keys :) 385Mar 19, 2011 8:22 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Perth Build.. waiting for keys :) 387Mar 20, 2011 2:37 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Perth Build.. waiting for keys :) 389Mar 20, 2011 4:54 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Perth Build.. waiting for keys :) 392Mar 20, 2011 6:23 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Perth Build.. waiting for keys :) 393Mar 21, 2011 12:22 pm contract 10/11 prestart 04/10 slab 06/10 bricks 07/10 roof 09/10 plaster 10/10 Ceiling 10/10 LOCKUP 10/10 tiling wet areas 11/10 garage floor 11/10 PCI 12.01.11 handover 11.02.11 https://forum.homeone.com.au/viewtopic.php?f=31&t=39361&hilit=malvern+springs We are in !!! ![]() ![]() ![]() ![]() Re: Sezza's Perth Build.. i've got KEYZ!!!!!!!!! 394Mar 22, 2011 10:05 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Perth Build.. i've got KEYZ!!!!!!!!! 395Mar 23, 2011 1:33 am Built with Sw1tch H0mes >Build thread< House status 15/12: Gates and A/C finally installed! Sep 09 Bought block, Dec 09 Engaged builder, Jul '11 Moved in Re: Sezza's Perth Build.. i've got KEYZ!!!!!!!!! 396Mar 23, 2011 7:42 am SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Perth Build.. i've got KEYZ!!!!!!!!! 397Mar 23, 2011 9:23 am Preliminary agreement 23/11 Contract 22/03 Prestart 06/04 - finalised on 30/04 Unconditional approval 10/05 Demolition 05/07 Slab 26/08 Brickwork 13/09-06/10 Roof frame started 07/10 viewtopic.php?f=31&t=32292 Re: Sezza's Perth Build.. i've got KEYZ!!!!!!!!! 398Mar 23, 2011 9:40 am i'm hanging out for my time off work in a couple of weeks so i can get stuck into moving outta this rental and into my house!!!! i just wanna get stuck into house stuff now!!!! was set on "mouse" for inside wall colour, but think we will go safe option with "smoke pearl". mouse is a lil dark (it is only a shade darker than smoke pearl) the sample we have of mouse is a little too similar to the tile we have picked up. at least we know what smoke pearl looks like in big picture as we had it in our last house and all our furniture goes with it. got a dark brown colour in mind for the theater. i'm thinking of a deep purple for that room but partner convinced on the brown. gotta get this sorted out asap so we can let the painter know. then gotta get our tiles purchased so they are ready for the tiler. work best under pressure... when theres is deadlines (in this case tradesmen wanting to start!!!) SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Sezza's Perth Build.. i've got KEYZ!!!!!!!!! 399Mar 23, 2011 9:53 am Congrats Sezza! Deemaree Kyndylan Capers: viewtopic.php?f=36&t=46852 My blog: http://www.sufficientlysufficient.blogspot.com/ Thank you so much everyone. This all makes a lot of sense. I guess when you talk to a builder who butters up everything to look very polished, you get to start believing… 7 19960 1 5153 1 2941 ![]() |