Set it and forget it, and clean up the odd corner with the stick vac. Waiting for another sale so I can get a second one, so we have one for upstairs and downstairs
good in theory, if i had one of those it would die of Lego poisoning...
Browse Forums Building A New House Re: Building with Metricon 8001Oct 10, 2018 8:13 am Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Building with Metricon 8004Oct 12, 2018 7:27 am Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Building with Metricon 8005Oct 12, 2018 7:28 am Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Building with Metricon 8008Oct 12, 2018 9:44 am Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Building with Metricon 8012Oct 12, 2018 12:52 pm Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Building with Metricon 8016Oct 16, 2018 9:47 pm Drew01 We're doing camera's and cabling after handover... Using Intelligent Security Concepts drew01 Since you're doing a KDR, are you getting internet via Cable, ADSL or Fiber? I was wondering what the process is nowadays when it comes to trenching and getting a leadin. Do you call up a Telstra certified contractor to do the trenching and then when its ready does a Telstra technician come out to run the cable into the house? Re: Building with Metricon 8017Oct 16, 2018 11:22 pm reaver Drew01 We're doing camera's and cabling after handover... Using Intelligent Security Concepts drew01 Since you're doing a KDR, are you getting internet via Cable, ADSL or Fiber? I was wondering what the process is nowadays when it comes to trenching and getting a leadin. Do you call up a Telstra certified contractor to do the trenching and then when its ready does a Telstra technician come out to run the cable into the house? We've got FTTC, so HFC (cable) overhead service. Metricon put in a PVC run when they did the trenching for the three phase, however it's been broken off near to the house in our instance, so they need to find it. The RG6 has two runs to the outside of the house, as well as provision for a satellite dish for TV (not that we'll ever get it)... Also has CAT5 for provisioning of the phone line into the study. My understanding wth Telstra is you put in an order and they do any required street work. In our case, it will be a bundle relocation, as they don't have as good a deal as we're on anymore, and I've already relocated it twice! Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Re: Building with Metricon 8019Oct 17, 2018 9:21 am Drew01 reaver Drew01 We're doing camera's and cabling after handover... Using Intelligent Security Concepts drew01 Since you're doing a KDR, are you getting internet via Cable, ADSL or Fiber? I was wondering what the process is nowadays when it comes to trenching and getting a leadin. Do you call up a Telstra certified contractor to do the trenching and then when its ready does a Telstra technician come out to run the cable into the house? We've got FTTC, so HFC (cable) overhead service. Metricon put in a PVC run when they did the trenching for the three phase, however it's been broken off near to the house in our instance, so they need to find it. The RG6 has two runs to the outside of the house, as well as provision for a satellite dish for TV (not that we'll ever get it)... Also has CAT5 for provisioning of the phone line into the study. My understanding wth Telstra is you put in an order and they do any required street work. In our case, it will be a bundle relocation, as they don't have as good a deal as we're on anymore, and I've already relocated it twice! Hi Drew01, A quick heads up if your house is to be served by FTTC then the Internet connection will come in via copper phone line not HFC. You will receive a device from NBNco called a Network Connection Device (NCD). The NCD will be connected to your phone line and provide power to the FTTC device installed in the telecommunications pit outside your house. Your router will then connect to the NCD. Re: Building with Metricon 8020Oct 17, 2018 4:00 pm Nope, I've already had it confirmed we'll be on HFC. Most of my old team now work for NBN Co... No idea what the box is, but that's what they've told me Plus we're not on the build schedule until 2021 Our Bayside KDR Thread: viewtopic.php?f=31&t=78298 Hi, First of all, thank you to this community for sharing your thoughts and opinions. We are in early days of our pre-contract stage for Metricon Doulton and we are… 0 10663 Hello All 🙂 We are planning to start our journey of construction our first home. We zeroed down on Metricon and henley homes based on design suitable for our lot and… 0 8090 We don’t live in VIC so want to know the exterior colours of Lumiere display so we can see it at the paint shop. Not building with Metricon so my request went… 0 17282 |