so did a drop in at 7am this morning on way home from a red eye flight from Singapore (so excuse the bad photography)
was hoping to see a bit of the tiling though the window and got very surprised as they have done much more than expected.
Garage door is in and installed, just need electricians to run the power points now.
down pipes are installed and not only did they do they ran the storm water around 60 meters down to the dam and put a little gutter in, considering from contracts I was expecting it to just be an outlet on the grass down hill from house really happy with the step up and beyond, so now everything drains direct to dam. (still need to be painted however)
tiles are in for all but the entrance hall and grout is being laid atm, apparently he was coming back onsite today to finish. (least that what he informed my wife)
lucky for me the main bathroom window was open enough to get the phone in to get some photos.
and I love it, so so want to get in there with some cleaning products to see the final look
so the feature tiles below are in the splash backs in the main and powder room as well as ensuite having it as a splash, feature wall in shower and both hob, (photos of that when I can get in the house.)
anyhow very happy with progress and cannot wait to see it with sinks and bath this week.
garage door
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
storm water
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
outlet for storm water
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
kitchen progress
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
main bathroom (what i thought were scratches on cupboard I went back to double check and is just some packing tape still on it)
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
feature tiles
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
shower/bath for main bathroom
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅