It's not really an issue. We had 100m fixed price piering and an provisional allowance as well. Only used about 70m and told we should see a credit. We get our final account this week will let you know
Browse Forums Building A New House Re: Who is building with Beechwood 15467Jul 25, 2017 9:15 am braddy_ We have FTTN NBN. So, its just a phone line... i am hoping the phone line itself was connected with the usual services. If your area having NBN then your phone line will be connected through NBN modem only. You Couldn't get any separate phone line. You have only option need to go with internet and phone package with your service provider... Re: Who is building with Beechwood 15468Jul 25, 2017 9:27 am braddy_ Does anyone know if connecting phone line from street to house is included? We should get keys this week (hopefully) and we have internet connection booked for 5 Aug (was earliest we could get :p) and now I am hoping we have a phone line. We have a phone point, which was done by electrician, we just got his invoice which includes "Wire & install phone feed from below meter box to study only" so I am worried we have missed something. Phone lines are up to us to sort out. Normally south west advise at time of electrical to do the lead in which looks like you did. They do all the wiring internal based on how many phone points you requested which looks like only 1 point in the study. Your service provider has to go through the trench using the conduit to the meter box. In the Shoalhaven we were advised it will take us about 3 weeks from time of booking. Re: Who is building with Beechwood 15478Jul 26, 2017 4:41 pm Story goes they changed the BASIX standards July 1st. So our house no longer meets the requirements. "It's too cold" so failed natural heating requirements. Re: Who is building with Beechwood 15479Jul 26, 2017 4:46 pm Needamoneytree Story goes they changed the BASIX standards July 1st. So our house no longer meets the requirements. "It's too cold" so failed natural heating requirements. So how did they propose to fix it? Re: Who is building with Beechwood 15480Jul 26, 2017 4:47 pm Tom2016 Needamoneytree Story goes they changed the BASIX standards July 1st. So our house no longer meets the requirements. "It's too cold" so failed natural heating requirements. So how did they propose to fix it? We find out on Sunday they would like us to go and see them. Hey guys building a new place through a volume builder and just wondering if i should complain to the site supervisor as we just had plasterboard installed. Looks like… 0 11845 Elvis has left the building... The site supervisor quit after 2 month on the project. I guess he was just instructed to bark at people, but didn't like when he was… 26 21640 |