Browse Forums Building A New House Re: Masterton Homes - The next thread 4.0 10262Apr 05, 2016 1:52 pm Masterton Overture 17/12/14 - Handover ...... we got the keys !! blog - http://www.mcnamaraadventure.blogspot.com Re: Masterton Homes - The next thread 4.0 10272Apr 05, 2016 8:14 pm WKVillina, house looks amazing!!! So big too. May i know what brick u guys used? Thanks!!! We picked Concord, not sure what they look like in big scale though:) Re: Masterton Homes - The next thread 4.0 10273Apr 05, 2016 8:16 pm I have to say J+H they are too young to be dealing with these builds I got the same feeling in preconstruction there was a no care attitude I could be in tears and there would be no response. Building this house has been the hardest thing emotionally/mentally I have dealt with and now we are on to SS number 3 I hope this one is better then the last 2 our first SS actually told us he was planning on doing a Christmas handover haha. We still have a rather extensive list of things to complete, they have finished our window frames and skirting upstairs but as you can expect with M another mistake, we paid extra for noggins so they could tack our lower floor skirting (we are doing our flooring after handover) but this never happened cutting and installing the skirting is not something we wanted or think we should have to do not sure what they will do the previous SS said he would get them back to finish after handover but now that he has gone we think he was just telling us anything. Villina 41 11/14 Contract 15 17/4 DA 4/6 Construct 26/6 Cut/Fill 11/7 Slab 16/9 Frames/Windows done 14/10 Bricks 20/11 Roof 16 3/3 lower roof 23/3 stairs 30/3 kitchen 24/6 PCI Re: Masterton Homes - The next thread 4.0 10274Apr 05, 2016 8:19 pm Thank you VillinaElite2016 we used pepper. The brick company should be able to give you addresses where the brick has been used so you can see what it looks like on a completed house... Villina 41 11/14 Contract 15 17/4 DA 4/6 Construct 26/6 Cut/Fill 11/7 Slab 16/9 Frames/Windows done 14/10 Bricks 20/11 Roof 16 3/3 lower roof 23/3 stairs 30/3 kitchen 24/6 PCI Masterton Homes - The next thread 4.0 10275Apr 05, 2016 8:37 pm WKVillina- I can believe it. What's a lousy 10% when they have most our money already. Today we didn't even get the 5.00 email. We have so little to be done but no trades on site. Hoping SS3 gets your build cracking. Your pics look great, that alfresco is huge! What size is it? VillinaElite2016- love concord. I'm sure it will look great! MGardz- I'm sure I've used up all the bad dons luck. Your tiles will be fine. Re: Masterton Homes - The next thread 4.0 10276Apr 05, 2016 8:39 pm WKVillina that looks awesome! I can't wait till we have walls up so I can see the rooms! On the plus our electrical rough in and aircon tubes were done today apparently (neighbour told me). Hopefully gyprock in the next month so we can get to lock up. We have about 3 smashed windows which need to be replaced, and our back six panel sliding door has a big cut/bend in it so it can't close. Hopefully they fix that soon. Hahahah as if! WKVillina thank you so much for sharing the photos, makes me excited about an end result! Everyone feel free to inbox me your bathroom pics, our inspiration is resort style warm tones, I am trying to get a sense of a day spa and want anyone visiting to feel instantly relaxed in our home. Our floor tiles were Pedra. Re: Masterton Homes - The next thread 4.0 10277Apr 05, 2016 8:54 pm Hi Brooke I'm new to this thread and my husband and I are planning to build a Charmhaven Elite with M also. We are building down at Calderwood valley and our land dosnt register until next year. I'm finding it frustrating that there is no display home or 3D image of the Charmhaven Elite so we can only visualise it from the plans. I'd love to see more photos of your house and any recommendations you can give for customising the plans that have worked for you guys. Thanks in advance 1/16 - Deposit paid on unregistered land at Calderwood Valley 3/16 - Tender deposit paid with M Re: Masterton Homes - The next thread 4.0 10280Apr 05, 2016 9:17 pm I know what you mean Bleaky, did you sign off on PCI or are they still paying the liquidated damages. I checked my email at 5.00 to and no response, we got a reminder about paying the roof and lock up claim which we are not paying until it's done but you guessed it again no response from today's email no response from Friday's either I hope they get things done for you Bleaky, it's like the frustration never ends. The alfresco is 7 x 5sqm. J+H to give you an idea we had our electrical rough in 12/2 and aircon 1/3 then gyprock started 14/3 so hopefully it won't be to long. Our sliding doors are still not on and are broken and damaged they even have foot prints on the glass where the tradies have walked on them. Our balcony door frame was damaged on delivery but they still installed it as the last SS thinks it can be repaired, I don't think so you will be replacing it. Villina 41 11/14 Contract 15 17/4 DA 4/6 Construct 26/6 Cut/Fill 11/7 Slab 16/9 Frames/Windows done 14/10 Bricks 20/11 Roof 16 3/3 lower roof 23/3 stairs 30/3 kitchen 24/6 PCI 4 25192 Hi all Just starting the journey with Masterton and building the Aston Exclusive. Will share the journey in case it's helpful to others. Tender 30 April 2024 Contract… 0 7597 I’ve tried this myself and found that it can really elevate the look of a room, especially when you’re working with timber floors. 1 21516 |