Browse Forums Building A New House Re: Building Bermuda 23 with Porter Davis 123Sep 26, 2014 8:36 am emily05 Hi Everyone, I just have a quick question. I have chosen to get sliding doors for the wardrobe in the bedrooms. I am just wondering for those who have passed this stage. Are your sliding doors like that in all display homes or are they different. I asked for sliding doors and they just said yes and i have no idea what they are going to look like. Hope everyone is enjoying the bermuda. hey Emily, forward to tlblhayward's comment, have a look at this page viewtopic.php?f=31&t=497&p=1239753&hilit=porter+davis+door#p1239753 the sliding doors PD give you as standard are not those that are in the displays Built the Bermuda with Porter Davis Re: Building Bermuda 23 with Porter Davis 124Oct 12, 2014 5:04 pm We just completed our initial building contact with PD. Just thought i will list our selection might help some one. Bermuda Base price - 156,900 Facade - Griffith - 4,900 Facade render - 1000 Brickwork over Garage - 1166 Brickwork over openings and rear of house - 946 Finishing touches style and Floor Style pack - 10,998 Celling height to 2590 - 3,718 Alfresco - 3,500 Ensuite and Bathroom Ensuite upgrade - 1,200 Niche in Ensuite and bathrrom - 368 Stone bench top in Ensuite - 326 Extended mirror in Bathroom - 92 Laminate shelf under mirror - 293 Stone bench top in bathroom - 326 Powder room - 510 Finger Grip sliding doors to robes (only 2 rooms) - 406 Dining hall sliding door upgrade to Boutiqu style - 554 Kitchen Glass Splash back - 1000 Vent for range hood - 362 Extended base cabinetry in Kitchen - 500 highlight window to bed 2 - 100 Capped gas point in Alfresco x 1 - 189 Capped water point x 3 - 378 NBN - 1433 Re: Building Bermuda 23 with Porter Davis 126Oct 13, 2014 5:58 pm Splash back price seems a bit low. You need to pay for fire proofing as well which is not included. I guess it all depends on the size of splash back you got. Also make sure you get them to specify on the drawings where the joins are if there are 2 pieces or more. Re: Building Bermuda 23 with Porter Davis 127Oct 14, 2014 10:11 am hi all were building with bermuda 23 and weve been charged for $1,888 for render with ferndale facade!!it seems like its not right! Re: Building Bermuda 23 with Porter Davis 128Oct 14, 2014 10:39 am just a quick question anyone here is having easement on their block?becaause we have 3meters easement on our block and PD told us to reduced 520mm on kitchen,alfresco and living area they said that it is the council regulation.thank you Re: Building Bermuda 23 with Porter Davis 129Oct 14, 2014 10:42 am Hi Melvinglenncallejo, we have a 2metre easement on our block as well, PD must have said that to avoid having piers or something on your slab? I am still waiting for PD to bring our easement issue up with us Built the Bermuda with Porter Davis Re: Building Bermuda 23 with Porter Davis 130Oct 14, 2014 10:47 am hi katemorley91,yah worst thing is we already signed the contract before seeing all of these post and also they have to upgrade our slad to h2 and its an additional costs for us!may i ask on how much is your total building costs?thank you Re: Building Bermuda 23 with Porter Davis 131Oct 14, 2014 10:51 am Oh really, so does the 520mm reduction on your house still mean you have to get piers or do you just have to upgrade your slab? How far away is the end of your slab to your fence line? We wont be near contract stage until the end of this year but we are looking at about $220,000 - $230,000 for everything Built the Bermuda with Porter Davis Re: Building Bermuda 23 with Porter Davis 132Oct 14, 2014 11:00 am they said that they need to upgrade the slab its beacause of the type of soil we got, i need to check when i get home katemorley91 because im still at work,our final contract is 234,800 which is a bit high,were building in allura estate in truganina which estate are you building?thank you Re: Building Bermuda 23 with Porter Davis 133Oct 14, 2014 11:24 am Oh Okay fair enough, we are building in Greenvale Orchards Built the Bermuda with Porter Davis Re: Building Bermuda 23 with Porter Davis 134Oct 14, 2014 11:55 am emily05 Hi abhi, Did they tell you that the Griffith facade is not actually rendered like the one in the picture. I found that out after my house has been rendered. Fairly annoyed. Hi emily05 Yes Facade is not rendered as in Picture, its all brick work. Paying on top of 5K for render is very annoying. Re: Building Bermuda 23 with Porter Davis 135Oct 14, 2014 11:57 am joea Splash back price seems a bit low. You need to pay for fire proofing as well which is not included. I guess it all depends on the size of splash back you got. Also make sure you get them to specify on the drawings where the joins are if there are 2 pieces or more. Thanks for the tip joea, i will add this to my list of questions . But this is just a allowance i guess, final pricing will be done on colour selection day. Re: Building Bermuda 23 with Porter Davis 136Oct 14, 2014 12:02 pm melvinglenncallejo just a quick question anyone here is having easement on their block?becaause we have 3meters easement on our block and PD told us to reduced 520mm on kitchen,alfresco and living area they said that it is the council regulation.thank you We realised this when we went to sign our initial contract with PD, we were very upset with them. This is because of Facade we have chosen. Riva would be the best because you will only take out 17cms with Frendale its 50cms. If you are reducing dont take the whole thing off your living, thats my suggestion. It will make a huge impact on dining are. We decided to take 25cms off living and alfresco and 25 cms through Garage and WIR. Which we thought will be less noticeable. Re: Building Bermuda 23 with Porter Davis 137Oct 14, 2014 12:06 pm melvinglenncallejo they said that they need to upgrade the slab its beacause of the type of soil we got, i need to check when i get home katemorley91 because im still at work,our final contract is 234,800 which is a bit high,were building in allura estate in truganina which estate are you building?thank you Standard slab is Class M, most places you build in Melbourne will be type H or Type P. You will need to upgrade slab anyway. From my research Site costs in Allura is around 10K to 12K for a 23 to 24 Sq house, unless there is serious issues with the block (like a boulder or too steep and requires retaining wall). Re: Building Bermuda 23 with Porter Davis 138Oct 14, 2014 12:10 pm abhi517 emily05 Hi abhi, Did they tell you that the Griffith facade is not actually rendered like the one in the picture. I found that out after my house has been rendered. Fairly annoyed. Hi emily05 Yes Facade is not rendered as in Picture, its all brick work. Paying on top of 5K for render is very annoying. I din read your post properly Yes they told us it is not rendered when we choose the fasade Re: Building Bermuda 23 with Porter Davis 139Oct 14, 2014 3:23 pm hi our site cost that was written in the contract is 19,500, hmpppp, did you pay for bushfire levy? we did and its additional cost for us like 5k Re: Building Bermuda 23 with Porter Davis 140Oct 14, 2014 3:26 pm Yessss we paid bushfire levy too not happy about the price but always good to have those extras on the house. ours is at $17,500 estimated at the moment Built the Bermuda with Porter Davis No idea about the driveway question, but your price for a house that size including landscaping seems very good! 1 22322 No, not yet. It’s currently being assessed by our building surveyor 4 19568 With that sort of soil type if you ask for a design to include piers then I would also include void formers. That way you should reduce the chances of settlement and heave. 7 20044 |