Browse Forums Building Standards; Getting It Right! 1 Mar 22, 2017 10:15 pm Hello, My builder has made a few changes during the build (e.g. how plumbing is directed from upper to lower floor, location of AC vents, location of storm water kerb discharge point). None of these change have made back to the working drawings. Should the working drawings be updated? Thanks! Re: Updates to working drawing during the build 2Mar 23, 2017 4:23 pm Hi Pawelpabich Yes they should be noted/hand drawn as cloud revisions and submitted, make sure you keep a copy Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs 1. Roof cleaning and paint - which colour do you recommend? I often see black/ dark grey in use these days but I would prefer… 0 8310 I had a similar issue with my fridge not too long ago. It wasn't the same model, but the symptoms were pretty much the same: the compressor would start and then stop… 3 7516 Okay sorry silly me, my wife has solves the mystery for me. It’s because the labels on the ports are all wrongly positioned by the builder hence it confuses me. 2 1373 |