Browse Forums Building Standards; Getting It Right! Re: final hand over inspection-defetcs 4May 07, 2016 11:58 pm 3in1 Supadiverta. Rainwater Harvesting Best Practice using syphonic drainage. Cleaner Neater Smarter Cheaper Supa Gutter Pumper. A low cost syphonic eaves gutter overflow solution. Re: final hand over inspection-defetcs 8May 14, 2016 11:00 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: final hand over inspection-defetcs 10May 18, 2016 11:30 pm building-expert Althom SaveH2O For the benefit of anybody else, a frame stage inspection is one inspection that should not be missed. That's a given but I'm puzzled as to why the ceiling cavity is inaccessible? Have you ever tried to get past heating and cooling ducts in tight ceiling space without dislodging or damaging something? I frequently find, on my pre purchase inspections, squashed or damaged ducting, done foolishly by owners or inspectors before me. Yep, next question? Just takes care and attention to detail If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 4488 i would suggest nothing is unreasonable for PCI. we did all sorts, including checking the hot water, checking all the GPO's had power, testing that the showers were… 9 98689 The significant date is when receive final payment invoice Check that section of contract Bit of fluff by builders prior to that 1 15951 |