Browse Forums Building Standards; Getting It Right! Re: Piers\Footing poured at same time as slab? 21Sep 04, 2015 7:43 pm We just completed bored piers for my extension and sure enough when we bored them out we had some water seepage. We cleaned them out , had them inspected and poured concrete. I would have hated to have them open for couple of days with seepage and sides falling in, and what if it rained? Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 22Sep 05, 2015 10:23 am Guess what? It's raining, boy am I glad I poured concrete yesterday. Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 24Sep 06, 2015 8:25 pm ![]() The piers are in contact with the soil and moisture could travel up the pier onto the slab.Defeats the purpose of a moisture barrier but I'm guessing because I haven't seen it done before. Its no different then when internal beams are poured first and the plastic is only put over the pad. The beam is left exposed with starters that are then tied into the slab mesh. There seems to be a perception on H1 that just because someone has never seen something done a certain way then it must be wrong. Re: Piers\Footing poured at same time as slab? 25Sep 07, 2015 7:34 pm ![]() ![]() There seems to be a perception on H1 that just because someone has never seen something done a certain way then it must be wrong. I don't think its wrong and it is good to experiment. In any case forum is for the exchange of ideas. I just don't like the risk of leaving open excavations overnight but there may be a s special case where it is convenient or necessary. It depends on many factors and including cost effectiveness of a particular method. Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 26Sep 07, 2015 8:55 pm ![]() ![]() The piers are in contact with the soil and moisture could travel up the pier onto the slab.Defeats the purpose of a moisture barrier but I'm guessing because I haven't seen it done before. Its no different then when internal beams are poured first and the plastic is only put over the pad. The beam is left exposed with starters that are then tied into the slab mesh. There seems to be a perception on H1 that just because someone has never seen something done a certain way then it must be wrong. Not saying it is wrong just interested how it would work .I haven't seen internal beam done that way either.I suppose it is the engineers I work with have their particular way of doing things and that's what you get used to. Re: Piers\Footing poured at same time as slab? 27Jul 14, 2016 12:24 pm Gday all, Im currently having some issues with whether or not i have had my piers put in. Reason being is i have been there every night and have not seen a hole, or the leftovers of any concrete to indicate they had been done. I just went last night and the waffle and re-bar was all done and the builder told me the piers are already done. Is it possible to have the site prepped, piers dug, checked, filled and the all the above slab all prepped for pour in one day? seemed way too fast. and its not a tiny slab, its a 46sq double and i was told it needed piers all through it. Looking though this topic it seems that the holes have to be checked by an external body. Can someone tell me who that body is? council? I want to check for myself. should there be photos? Cheers Simo Re: Piers\Footing poured at same time as slab? 28Jul 14, 2016 3:41 pm Have look at your building permit then call your building surveyor and ask for pier inspection certificate. Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 29Jul 14, 2016 7:49 pm The geotech or engineering company will inspect the piers to confirm they are founded into the appropriate material and companies like group 4 building surveyors also will inspect the piers.You can have the excavator cleaning holes while you are inspecting and the concrete pump and trucks lined up waiting for the go ahead so it can be done all on the same day. If you have the design you can physically check if the piers were installed usually there will be a pier at least on every corner. Re: Piers\Footing poured at same time as slab? 30Jul 15, 2016 8:37 am ![]() Gday all, Im currently having some issues with whether or not i have had my piers put in. Reason being is i have been there every night and have not seen a hole, or the leftovers of any concrete to indicate they had been done. I just went last night and the waffle and re-bar was all done and the builder told me the piers are already done. Is it possible to have the site prepped, piers dug, checked, filled and the all the above slab all prepped for pour in one day? seemed way too fast. and its not a tiny slab, its a 46sq double and i was told it needed piers all through it. The question is, was it done correctly and certified complaint? I doubt it because With cement trucks backed up ready to pour.. dealing with non-compliance in this instance becomes a big problem. All engineers require at Least 24 hrs notice prior the pour to check drawing & compliance matters, for this very reason ![]() Looking though this topic it seems that the holes have to be checked by an external body. Can someone tell me who that body is? council? I want to check for myself. should there be photos? Cheers Simo Here in WA an engineer should issue inspection and compliance certification and this is available to all clients when requested, you should have something similar please check with your local Council building authority Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Piers\Footing poured at same time as slab? 32Nov 20, 2023 7:58 pm 1.) Edge and slab piers up to 0.4 m in depth may be poured integral with main slab. 2.) Edge and slab piers between 0.4 m and 1.0 m may be poured integral with main slab providing a bond break is installed between top of pier and underside of edge beam. 3.) Edge and slab piers greater than 1.0 m must be poured separate to main slab. yep sounds good make the footing bigger to to allow for the pipe in the middle 3 2800 PM me your email. I have a build excavation calculator you can use based on your plans to double check what your builder is telling you. Cheers Simeon 1 3571 ![]() great plan external better than directing water behind the bricks 6 3095 |