Browse Forums Building Standards; Getting It Right! Re: Piers\Footing poured at same time as slab? 21Sep 04, 2015 7:43 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 22Sep 05, 2015 10:23 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 25Sep 07, 2015 7:34 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 28Jul 14, 2016 3:41 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Piers\Footing poured at same time as slab? 30Jul 15, 2016 8:37 am Designer,Engineer (Civil,Const & Envir),Builder,Concrete & Masonry Contract.Struct Repairs Re: Piers\Footing poured at same time as slab? 32Nov 20, 2023 7:58 pm 1.) Edge and slab piers up to 0.4 m in depth may be poured integral with main slab. 2.) Edge and slab piers between 0.4 m and 1.0 m may be poured integral with main slab providing a bond break is installed between top of pier and underside of edge beam. 3.) Edge and slab piers greater than 1.0 m must be poured separate to main slab. yep sounds good make the footing bigger to to allow for the pipe in the middle 3 2800 PM me your email. I have a build excavation calculator you can use based on your plans to double check what your builder is telling you. Cheers Simeon 1 3571 ![]() great plan external better than directing water behind the bricks 6 3095 |