Is it acceptable building practice to cut concrete sleepers to fit between the steel 'H' uprights in a retaining wall?
The wall is on the boundary between two houses, 1.5 metre high, and will be 1.25 metre from each house.
I'm concerned about any exposed reinforcing rods rusting and possibly cracking the sleeper.