Browse Forums Building Standards; Getting It Right! 1 Feb 24, 2024 10:27 pm Hello and I hope someone has some expert advice for the following: I am renovating an older house in Victoria. Re-framing is being done by a carpenter who seems to be cutting corners by (a) Leaving old, damaged timber in place and just slapping new alongside and more importantly: (b) A loadbearing bearer under the house needs replacement of approximately 1.5m. My actual intention was to have the entire bearer and the two next to it, replaced. The tradesman has simply put in two new stumps with new 1.5m of bearer right next to the old, leaving the old rotting stumps in place with the old bearer literally crumbling apart. The house is quite low to the ground. What would happen if the old stumps and bearer section eventually give way, and the new bearer section is 4" away from it? I can upload a photo or even short video. Thank you! Re: Framing Questions 2Feb 25, 2024 9:28 am Please post photos What is your agreement with the carpenter? What state are you in? Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Framing Questions 3Feb 25, 2024 9:07 pm Thank you and I will probably contact you via your business to ask further advice. Here are a couple of photos, showing the new 'twin' stumps alongside the old. I've put comments on the photos, but am not sure the text will be readable. Basically, the old bearer is shredding from underneath, sounds hollow, and I can't for the life of me see how it would support the wall framing and cladding in this condition. Thank you and best regards. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Framing Questions 4Feb 25, 2024 9:11 pm It’s pretty standard to reinforce like that and sister old joists/bearers. You can’t really remove it without removing everything it is holding up. It is the most cost effective way to fix it. If you want complete replacement maybe more extensive works might be needed. 2 13520 ![]() Hi everyone, Approaching the framing stage of our build. Went for a sticky beak today to find the timber a bit of a dog's breakfast... some long lengths sitting on top… 0 11340 So I have read the relevant sections of this report, and what worries me the most are the rectification works which are needed to that steel beam. Frame overhangs are not… 8 54895 ![]() |