cool thanks
Browse Forums Building Standards; Getting It Right! Re: Frame exposed to weather for 6 months 26Aug 24, 2024 9:17 am We pointed it out to certifier at frame stage inspection and he directed builder to engage mold cleaners to clean off mold before gyprock, seem to have come off and we cleaned a bit more ourselves to make sure all is gone, that is one of building issues. I've gone for pre-fab walls. I did it because I wanted to remove the idiot factor from the construction on site , control theft and reduce waste plus its supposed to be… 10 44221 Our external decking was only installed 2 months ago, and already moulded, with cracks, and some timber decolorated. The decking is in an exposed area, uncovered in our… 0 12576 0 5769 |