Browse Forums Paving & Concreting 1 Jan 10, 2019 12:15 am Hi all, I’m building a 6sm brick strong room on top of a new slap under the house and have some questions. How long after the slab is poured can I start laying brick on it? What kind of brick would be suitable, I was thinking of the strongest brick available. I think it’s a red compressed one. Do I need to add damp provention DPC between a low level of brick work. (The slap has moisture retention plastic under it). I will have very little room for the roof between the house timber floor, I was thinking of using some sheet steel for this and securing it with cement and a couple of steel cross beams, good idea? Any thoughts and ideas are greatly appreciated. Cheers Max Hey, I am wanting to add a second toilet to my house, bit we have limited room. There is a hallway/entry that is never used, so was thinking this could be an option. Only… 0 4697 Hi all, My first post, we are building a house and can’t decide the layout of the lounge room. We have a large N/W facing window and are wanting to have a wood slow… 0 13719 sorry mate, not wasting more time on this. Youve completely missed the mark on some fundamentals and regardless of how many times i try and put it to you differently, you… 11 9179 |