Browse Forums Paving & Concreting 1 Jul 22, 2018 6:43 pm Hi, We put our fibreglass pool in prior to slab and they set to builders pegs and levels. Then the slab was poured and it looks like the pool (without coping) is sitting approx 4-5cm below the alfresco (without tiles). Adding 1cm alfresco tile and 2cm coping would leave finished pool level approx 3-4cm below alfresco. Can we fix this by using thicker coping? I can live with 1-2cm difference but not 4cm. Any other ideas? Cheers Hi, have purchased a house with 2 single garage doors. The Centre pillar one side sits proud to the other. Can I change 2 doors into one. Please see picture. 0 2420 Hi all, Trying to workout the minimum stepdown required between slab for my house and the outdoor alfresco area. Garage is 100mm lower than rest of the house and plan was… 0 3663 Hello! I've alfresco pitch of 3 degrees sitting just below the highlight window. Need advice on below: 1. Will the 3 degree pitch be ok to drain the rain water? The roof… 0 3292 |