Browse Forums Paving & Concreting 1 Aug 27, 2017 9:12 am With my build handover hoped for around feb/march 2018 I am considering just doing my driveway and front path up front and holding of on side and rear concreting till after winter, have read that post winter is the best time for concreting pathways, question i have is does it really make much difference doing it after winter or is the feb or march just as suitable. Re: worth delaying concrete paths till after winter 4Aug 27, 2017 10:55 am Best for concreting is to avoid extremes of weather. That includes both frosts, and hot dry periods, so autumn or spring are going to be the best times. The Harder You Try - the Luckier You Get ! Web site http://www.anewhouse.com.au Informative, Amusing, and Opinionated Blog - Over 600 posts on all aspects of building a new house. The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 5152 DIY, Home Maintenance & Repair Are you doing this with a building permit? Conversion of a non habitable room into a habitable room requires building permit. 3 17318 Hello needing some advice. I was about to build my Alfresco and needed a new slab and remove exisiting slab as its not standard. So they start to excavate and jackhammer… 0 10687 |