Browse Forums Paving & Concreting 1 Jun 12, 2017 3:15 pm Hi everyone, I have two reticulation fill point for terminte protection around the house. The concreter whom did my pathway has covered one of the reticulation fill point with concrete. Is this correct? If not, would it be okay only to have one reticulation fill point? Appreciate any advice A person needs to be licensed to offer financial advice. Surely the accountant you use would have been chosen for his/her expertise in this field. Have you asked your… 1 6734 Much a do about nothing. You can see the fall heading to the actual drains. Stormwater ingress will be minimal and it's far better to have the top sitting flush rather… 12 6245 As most others have posted above the install isn't compliant. The pipe is meant to be covered in loose soil or sand, the pipe has holes in it that leaks out a termicide… 10 5727 |