Concrete pathway over reticulation fill point question
Page 1 of 1
I have two reticulation fill point for terminte protection around the house. The concreter whom did my pathway has covered one of the reticulation fill point with concrete. Is this correct? If not, would it be okay only to have one reticulation fill point?
Appreciate any advice
Related
10/06/2023
1
A person needs to be licensed to offer financial advice. Surely the accountant you use would have been chosen for his/her expertise in this field. Have you asked your…
3/07/2023
12
Much a do about nothing. You can see the fall heading to the actual drains. Stormwater ingress will be minimal and it's far better to have the top sitting flush rather…
26/12/2023
10
As most others have posted above the install isn't compliant. The pipe is meant to be covered in loose soil or sand, the pipe has holes in it that leaks out a termicide…