Hey guys,
My slab gets poured on Tuesday morning and I just want to ask what is considered the best method for curing?
My plan is to turn up in the afternoon and build a sand bank up along the outside edge or on the top perimeter of the slab (which method is preferred?) and then flood it with water and I presume its best to leave the hose running on a low pressure to allow for any water that escapes the dam wall?
Would it be better to build up the sand bank on the slab to divide it into 4-5 rectangle sections??
I should be able to visit site around 3-4 times a day for a week to check on it and fix any sand banks that have failed,
Am I on the right track here, what has everyone else done??
Thanks in advance!