Hey all.
I dug a trench that I had to lay my telecom conduit in and it is 400mm deep.
I will be pouring a concrete path over the top of it.
If I backfill with gravel will that be ok or should I just throw the dirt back in.
Do I need to do anything special to the gravel ie mix in cement?
My soil is highly reactive clay.