Browse Forums Paving & Concreting 1 May 14, 2013 12:42 pm We have started paving around the house and wanted a concrete substrate to put pavers/decking on at the back of the house. I asked the concreter to keep the finished height of the concrete 90mm below the weep holes and we have been given this:
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Leaving aside that it is not what I asked for , is this going to cause problems with rising damp? (As we are on a slight slope the rest of the weep holes around the front will be two to three courses above the paving and most of the house at the back is weatherboard so no weep holes to worry about.) Re: Another weep hole problem 2May 24, 2013 3:30 pm I had a feeling concrete can encroach to 30mm of weephole. it depends on the natural ground level, if they excavated their boundary wall needed to be built as a retaining wall. If you filled, which sounds like the case then you… 1 7086 I know foam has been around since the 90's and CSR started manufacturing Hebel in 1989, so it's definitely possible 5 5457 You are correct. Just read through all the ncc rules and 75mm is the minimum requirement for me. 4 11183 |