Browse Forums Paving & Concreting Re: Concrete Driveway - Payment Breakdown 4Jul 01, 2012 9:01 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Concrete Driveway - Payment Breakdown 6Jul 01, 2012 11:34 am Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Concrete Driveway - Payment Breakdown 7Jul 01, 2012 12:55 pm Landscape Design & Construction http://cherub.squarespace.com/ Re: Concrete Driveway - Payment Breakdown 8Jul 01, 2012 2:58 pm Foremost Building Expert in Australia,assisting with building problems/disputes, building stage inspections,pre-contract review advice for peace of mind 200 blogs http://www.buildingexpert.net.au/blog Re: Concrete Driveway - Payment Breakdown 9Jul 01, 2012 3:52 pm Landscape Design & Construction http://cherub.squarespace.com/ Re: Concrete Driveway - Payment Breakdown 12Jul 01, 2012 5:34 pm Settlement 1/2/12 New Shed 23/3/12 Slab poured 27/3/12 Frame complete 4/5/12 Roof complete 1/6/12 LOCKUP 29/6/12 Our new build blog http://kareenhillsownerbuild.blogspot.com/ Re: Concrete Driveway - Payment Breakdown 18Jul 10, 2012 6:37 pm There is no need for more than a 50% payment before completion as thats all that is needed to cover materials. Anything more than that then be careful. If its an established company with a good reputation and perhaps a good ranking on google etc then they are not going to lose all that just to run off with your deposit. A random ad in the paper then who knows. To my understanding early saw cuts are to control shrinkage cracks, so doing them now would be pointless. Control joints may reduce ugly cracking during periods of soil… 3 9829 Hi all I need a guidance on how far I need to space expansion joints in the concrete driveway and its type (keyway/foam.) Contraction joints are at 3m max for a 125 slab. Thanks 0 10921 regardless, your contract stipulates a payments schedule and SOPA doesn't give provision to that scenario. Your contractual terms appear to stand. Hence get a lawyer, it… 4 11849 |