I was told by a concretor that, once they install all the mesh inside the formwork for a driveway, they need to cut the wires at "some places" (didn't elaborate where and why, other than saying something about concrete not being as restricted bla bla, don't remember).
This is the first time that I've heard of it.
Is this normal?? Why would I want to cut "some wires" throughout the driveway?? I thought that, once all the reo is installed (and overlapped as required), that's it ???