Browse Forums Paving & Concreting 1 Mar 04, 2011 9:26 pm Im currently working on a PIY paving job in Adelaide and using road base and then sand under the pavers. I was wondering what is considered to be a suitable level of variation of the road base after compaction? I have allowed for runoff and have used a compacter to get it reasonably flat but wasnt sure if a 5mm variation or a 10mm is acceptable and will just be taken up by the sand? I brought terry road box hill in June 2022 House was meant to be completed Nov 2023 That did not happen I had to chase them so much to the land Registration and… 0 2503 I work with owner, he/she is my man on the ground and I instruct them when to visit the site and take photos and I have other tools in the bag. 4 15265 Looking for advice on whether this variation in tile colour is acceptable. The large tile on the left was used in my main bathroom renovation 1 year ago. My ensuite… 0 8488 |