Browse Forums Paving & Concreting 1 Nov 06, 2010 9:16 pm Hi Our slab has been laided and the builders have started the frame work. Everything good so far except in the laundry the slab wet area cut out and the frame are not parallel leaving a gap of 10cm on one end. Does anyone know if this is very common ?? We are not sure if it is going to be a big problem later on? Or if the tiler can fix it ? Anyway any comments would be helpful. Thanks Re: Slab not parallel to frame 2Nov 07, 2010 9:32 am Hi GLLSC, Had a similar problem with our build. We insisted it get fixed or we wouldn't pay slab invoice. They put some reinforcement poles into the slab, and had more concrete poured. Fixed in a day Re: Slab not parallel to frame 3Nov 08, 2010 11:31 pm hi GLLSC, i think it is called "frame overhang" tolerance level is 10mm if i am not wrong, you might want to read this viewtopic.php?f=31&t=26103&hilit=frame+overhang mp 2 4612 Long time forum searcher first time asker. I've got this hideous aluminium frame for a front door and side windows. Is there a way or a product out there that could be… 0 2227 This certainly doesn't look good. I would be engaging with an independent inspector to have a look at this. As for the unscheduled site visits, most builders are quite… 1 21933 |