Browse Forums Paving & Concreting 1 Jun 15, 2010 2:05 pm Hi all, I need a shed (8x14m) floor concreted. Have got quotes with either hand or machine trowling for a smooth finish, control joints for the machine trowling will be cut while the joints will be done by hand for the other option. The guy who quoted for the hand trowling believes this method is superior. So my question: is there is a difference (ie pros or cons) between hand or machine trowling? Thanks! Hey all Currently renovating our laundry, bought a new washing machine but have found that the drainage hose is alot shorter than the old machine (which I used to get the… 0 17527 It will be neat but you won't have much freeboard. At least they are not weep holes. Are you in a high intensity rainfall region? The regulatory slope is only required… 3 8361 We've had decent weather for last 7 weeks and now the drvieway has been cut out we had an evening of 50mm of rain including all the water from half the street, ground is… 0 4490 |