Hi all,

In the NCC V2 3.2.3.1 there is a variation for South Australia that says - (e) After vertical surfaces are stripped of formwork, slab edges must be finished prior to curing.
In this instance, what does "finished" mean?


Thanks
Related
17/09/2023
13
Structural Issue - DPC Higher than finished floor level

Building A New House

interesting situation what happened after builder issued final invoice? did you list as defect or not does the building surveyor have any responsibility? ie. issuing…

13/01/2024
0
Poorly finished exposed recycled brick boundary wall.

Building Standards; Getting It Right!

Hi all, My neighbour has built his 15m long garage on our boundary. It was agreed as part of the planning permit that the wall must be in exposed recycled brick. For some…

15/02/2024
0
QLD - Builder finished without notifying Building Certifier

General Discussion

Hi, I contracted a Builder to do a Garage to Bedroom + ensuite conversion (Class 1a), the Builder engaged the Certifier and Engineer and received BDA from the Certifier…