The concrete slab rebate is extending across the bricks by 10-20 mm
Concretor mentioned for perimeter concreting, that extension needs to be chipped to maintain the perimeter concreting 75mm below weep hole. Please advice if this is okie
Browse Forums Paving & Concreting 1 Jan 15, 2022 9:12 pm The concrete slab rebate is extending across the bricks by 10-20 mm Concretor mentioned for perimeter concreting, that extension needs to be chipped to maintain the perimeter concreting 75mm below weep hole. Please advice if this is okie 15 14891 The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 3303 yep, clearly mark where the infloor heating pipes are before drilling or nailing 1 5449 |