Browse Forums Bathrooms and Laundry 1 Jul 12, 2017 10:38 pm Hi all, Helping my brother with his bathroom, he is starting from scratch as he is remodeling the entire bathroom so the tiles old villaboard walls etc have all come down. I had a few people mention to me a different order in which the tiling should be done (not professionals)) It'swhile since I did my own and just want check the way it's meant to be done and the order. We have to put up the below, what order would you advise or know it to be done? I'll put it in the order I was going to do and appreciate being told different or the correct way 1. Villaboard the walls 2. Waterproof the walls and the floor 3. Tile the walls from floor to ceiling 4. Waterproof the floor and into the corners of the walls where meets the floor 5. Put down the bedding of sand and cement and float run off to the floor drain 6. Tile floor Thanks heaps Geoff Re: Bathroom renovation advice 2Aug 11, 2017 7:55 pm I would suggest to follow 1. Villaboard the walls 3. Tile the walls from floor to ceiling 6. Tile floor 5. Put down the bedding of sand and cement and float run off to the floor drain 4. Waterproof the floor and into the corners of the walls where meets the floor 2. Waterproof the walls and the floor I recently went through a similar renovation and move scenario when updating our family home. We also swapped some rooms around and tackled a major… 2 10032 This is a very tight fit, I'm not sure if you'll be able to achieve what you've described. Would you consider accessing the separate toilet from the laundry? If so maybe… 1 11252 Hello Josh, This is Irving from PRIMA, we are a manufacturer of the staircase, railings, kitchen cabinets, windows, doors from China. If you have requirement to purchase… 0 5457 |