Browse Forums Bathrooms and Laundry 1 May 02, 2016 9:18 pm Hi guys, I just found out the plumber drill the wrong hole for the standing mixer of the basin. My plan show LHS mixer on the left and RHS mixer on the right. But now they drilled both holes on the LHS of the basin. Should I ask the them to change the benchtop? is that too harsh from me.? I actually prefer the position drawn on the plan. I don't know why they make the mistake. I talked to SS and he said he can't do anything about it. What should I do. Thanks Re: wrong position of the mixer 2May 02, 2016 10:54 pm It's their mistake. If the plans say otherwise then you are within your rights to push the issue. Sounds like your SS is just trying to get out of it and will if you let him! If you are not happy, stand your ground and tell them to fix it. Re: wrong position of the mixer 4May 08, 2016 11:12 pm I talked to him and he said he will change. It should be good to check everything by ourselves, can't really rely on the SS. they are so careless Thank guys Unless the room is for storage then it's non compliant BCA V2 2019 S3 P3.8 You have 2 options 1. The builder deconstructs the section and rebuilds as per plan /… 7 10658 2 31332 there is only 20% difference in concrete strength between 20 mpa and 25 mpa, so check with your engineer first if it fits his calculation tolerances. There are ways to… 6 18294 |