Browse Forums Bathrooms and Laundry 1 Nov 07, 2006 12:18 pm I'm not sure if I should have stated a new topic or not, but if I've done the wrong thing, I'm sorry.
Slightly related to the splashback thing.....but not in the shower recess.... On pulling off the old ceramic wall tiles, I've found that the original builder put plaster down to the tile line, then installed cement sheet, with no plaster under it. Is this normal, or should I replaster the whole wall and then install cement sheet over the top in the areas I want to tile. Not sure what is best practice here. If all you can see are obstacles, you have lost sight of the goals Re: Cement sheet question 2Nov 08, 2006 1:52 pm It is normal practice to tile over fibre-cement sheeting in wet areas and then use gyprock (preferrably Aquacheck) around the tiled area. The tile end up closer to the finished height of the plaster as the fibre-cement is only 6mm thick. Thanks Luke 3Nov 08, 2006 3:44 pm Dukekamaya It is normal practice to tile over fibre-cement sheeting in wet areas and then use gyprock (preferrably Aquacheck) around the tiled area. The tile end up closer to the finished height of the plaster as the fibre-cement is only 6mm thick. That's pretty much what I thought. When I did the kitchen, I plasterboarded the whole thing first then installed the cement sheet over the top of that, and I thought then that it was a bit of overkill. If all you can see are obstacles, you have lost sight of the goals Hi, Currently building, we are on a sloping block so we have from floor level to the roof in axon cladding. Below floor level to the ground I want to put brick facings /… 0 2736 DIY, Home Maintenance & Repair All my inside walls are Fibre Cement & House has Steel frames... Tricky when one wants to hang pictures or do Wainscoating Paneling up the hallway. Those little nail… 0 1813 thank you! do we need to get this or our builder before we commence new build on the block? 2 4418 |