Browse Forums Bathrooms and Laundry 1 Sep 17, 2012 11:05 am Have a Bathroom / Shower / Toilet, one step down area, three seperate 'rooms' Getting quotes on having the area screeded, a cople of quotes have suggested to to do the screed in seperate sections in so far as doing the toilet, coming back a few dayts later to do the ajoining bathroom/shower; Other quotes nominate one big screed to be done in the single day. Not sure which way is better. Any thoughts form anyone knowledgable out there? Re: Screeding - One big screed or split it up into sections 2Sep 17, 2012 5:35 pm Doesnt really matter. I have seen it done both ways. My tiler screads in one hit usually. Cutting Edge Kitchens and Cabinet Making http://cuttingedgekitchens.net.au http://www.facebook.com/pages/Cutting-Edge-Kitchens/290484196676 Mobile : 0419 430 575 PH: 9452 4772 Fax :9452 4772 cuttingedgekitchens@outlook.com Before you rip it up, if you can in the grout lines, drill some holes and pour/inject techgrip by sika. I have used it to bond mdf to timber, but in the process it dripped… 1 4284 Hi all, We're curring working on our outdoor and have some questions in relation to screed. I've tried to find information online, without success. Apologies for the… 0 3336 Currently renovating, and our main lounge is 5m x 10m, with a cathedral roof peaking at 6.5m high. Currently have tiles on concrete slab. Room is very hard to heat. I am… 0 4795 |