Has anyone ever heard of this. I just received a letter from the waterproofing people saying this coating had not been done on our wet areas (due to the bill not being paid), and they should not be tiled until it is done. Also said the polyurethane based membrane system should not be left exposed for long periods of time and should be tiled within 1 monh of installation.
????? ?????