Ducted refrigerated after handover for double storey
Page 1 of 1
If the builder does large enough ducts, is it worth doing the actual unit and zones post handover?
We have been quoted 22.5k to install an Actron air esp plus 19kw system with up to 8 zones. 16 outlets. 19kw seems insufficient since I have seen that recommended for smaller houses?? Apparently it is only single phase too.
I haven't yet had a chance to find out how much the builder would charge for the duct work and how much an installer would charge for the rest.
Would appreciate any advice. Tyia
Have a 17 kW actron add on cooling, house is 48 square, none in garage, got thermally broken double glazed windows, with excellent insulation, 4 zones, and never ever need to run all zones, run mostly 3, and cools house superbly, had a fantastic installer, which counts just as much as unit. 19 kW sounds fine.
Done it during the build, bit have also previously done another house after the build, had to make sure, ducts were in early and big enough, as air con ducts are bigger than the heating ducts.
I am getting them to quote me on upgrading the heating to sp5 so the ducts are bigger. Also 4 zones. They said I can then just add on cooling after.
We are building a 46sq double storey. We have a quote for Brivis SP6 heating and Actron 19kw add on cooling (3 phase) for $19k. This includes 18 outlets, 4 multi controlled zones. The installer is installing the duct work during construction and then the heating and cooling post construction.
We are building a 46sq double storey. We have a quote for Brivis SP6 heating and Actron 19kw add on cooling (3 phase) for $19k. This includes 18 outlets, 4 multi controlled zones. The installer is installing the duct work during construction and then the heating and cooling post construction.
Who are you building with?
Building with Porter Davis.
Related
28/03/2024
1
Hi Kristy Around $1.7-1.8m or around $4,600/sqm. if you PM me your email I will send you a break up in a spreadsheet so you can get an understanding of the costs for…
29/01/2024
0
Hello All 🙂 We are planning to start our journey of construction our first home. We zeroed down on Metricon and henley homes based on design suitable for our lot and…