Hello All,
I am building a very small retaining wall (2 besser bricks high) and levelling out for a small entertaining area. I poured cement into the footing the other day 300 x 300 with trench mesh though I forgot to put start bar in.
Length 5m x 1m L shaped retaining wall.
I will be core filling the blocks and install 2 x 12mm horizontal reo bar slotted into the blocks.
Should I drill into the foundation 100mm and install start bar or leave it?