I'm slowing winning the landscaping battle but it's been a hard slog and there's much left to do.
I'm nearing the point of being ready to prep for turf (I had to build 55mm of retaining walls out the front/side 1st). I've still got another 20m of wall out the back to go but the DA for that won't be approved for at least another month (sharing with the neighbour).
I wanted to do all the prep and laying work for the turf in one hit (52t of underlay + 525m2 of turf) but realistically I won't get to that until March sometime.
Question is, is that too late? I don't really want to spend another winter with dirt but I'd hate to put down 500m2+ of turf and not have it take.