Browse Forums Landscape & Garden Design 1 Apr 11, 2012 4:33 pm Hi fellow H1'ers a bit stuck...we are on a bit of a slope and our builder built us "up" and has left us looking over the back of our neighbours. We have a retainer wall running along the back end of house which extends approx 3mtr's now my advice/question is Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Ohhh retainer wall ends at an easement we have... should we continue the retainer wall along the back of the house and concrete/path it to the future decking? would we need to put a hand rail because it will be at least 900mm high Then scrape/level the "easement" drop section and gradually level it out with the rest of the area? Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ our future decking will start from the downpipe of the stacker come out approx 3metres and end in line with the retainer wall... I have put together a very quick drawing Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ thoughts? Am i confusing everyone?? Hi VK, Think it's worth investing time in an Owner Builder course to equip you with basic knowledge on Australian Building Industry and its regulations. Also, I suggest… 11 23140 Landscape Design Parramatta We have been doing a large amount of landscape design work in Sydney… 0 3 Need advice on the backyard plan above. Should I excavate and cut all of the dirt to level with the house slab or semi-excavate as per photo above? Both left and right… 0 24871 |